fstorch
Member
Before calendar visualization is deprecated in favor of fullcalendar, i need to address an issue which only occurs with fullcalendar:
I got a list which stores employments that span several weeks.
So there is a start and and a finish timestamp field.
As I don't want to clobber the calendar view with event bars stretching several weeks (and there are dozens active in parallel), I prefer to show only the start event and finish events as bars at the respective days.
So I have one event for the start timestamp with color green and one event for the finish timestamp with color red. In both events no end field is selected. Unfortunately the finish event is using the green color of the start event, although the legend shows the correct red color.
calendar is showing the correct color.
Looks like the background-color is stored inline, so I cannot override with a css (didn't create a custom.css so far).
What may I be missing?
(Fabrik 3.8.1 with fresh github)
I got a list which stores employments that span several weeks.
So there is a start and and a finish timestamp field.
As I don't want to clobber the calendar view with event bars stretching several weeks (and there are dozens active in parallel), I prefer to show only the start event and finish events as bars at the respective days.
So I have one event for the start timestamp with color green and one event for the finish timestamp with color red. In both events no end field is selected. Unfortunately the finish event is using the green color of the start event, although the legend shows the correct red color.
calendar is showing the correct color.
Looks like the background-color is stored inline, so I cannot override with a css (didn't create a custom.css so far).
What may I be missing?
(Fabrik 3.8.1 with fresh github)